Construction

Construction phases

2023: Completed

Phase 1

Pre-Design and planning Site Plan Package

2024 - 2025: In Progress

Phase 2

Detail Design / Construction - city approval Building Permit - Temporary Temple Detail Design / Construction- city approval Building Permit New Temple Core & Shell

2024 - 2025: In Progress

Phase 3

Tender, Award, and Construction Temporary Temple & Priest Residence Tender, Award, and Demolition Existing Temple Tender, Award, and Construction core/shell New Temple

2025 - 2030: To be started

Phase 4

Inner sanithanam (சன்னிதானம்) – Sthapthy Year 2025-2030

2027- 2029: To be started

Phase 5

Site work , parking and landscape

2028-2030: To be started

Phase 6

Kumbabishegam


Pledge Your Support

Join us in making a lasting impact by pledging your support for the construction of our sacred temple. Your contribution will help create a place of spiritual refuge and community connection for generations to come. Click below to learn how you can be a part of this meaningful journey.


Monthly/One Time Donation

Help bring the vision of the New Temple to life by choosing a hassle-free way to contribute through automatic monthly donations or make a one time donation. Join us in this sacred mission with a donation plan that’s both easy and convenient.



Sponsor a Brick

With each donation, we move closer to establishing a permanent, sacred home for the Ottawa Sivan Temple—a place where devotees can gather, worship, and find spiritual solace for generations to come."

Sponsor a Square Foot

The new temple will feature expansive spaces designed to accommodate large gatherings, allowing devotees to come together for worship, prayer, and to experience divine blessings in a serene, welcoming environment.

Timeline

2019

Pre-Design and planning Site Plan Package

2020

Architect P2 Concept on Board with us. Developed our plans to locate a new temple in the back. During the design development process with the P2 Concept, the need for Stapathy and his input was realized.

2021

The new Sthapathy selection process started. We have hired Selvanatha & Ponni Stapathis from Sri Vaidyanatha Sthapathi Associates on board with us. A newly modified temple plan (Raja Kopuram and entrance hallways were rearranged.

2022

P2 Concept was given a new mandate to revise the plan. However, during the process City od Ottawa sent out a new floodplain development for North Gower. The new food plain line appeared to be closer to the new temple and it made us believe the new temple in the back would not be a reality anymore. New surveyor work was initiated to review the impact on the new flood plain. It is still in the process. However, early indication is that the impact is minimal, if not for no change

2022

City Pre-Consultation meeting took place and confirmed the new temple construction located in the back of the existing temple was accepted by the city.

2023

Temple orientation to the true east was recommended and a new site plan was prepared by Sthapathy. Plans were reviewed by P2 Architect for local building code requirements.

Nov 2023

The site plan was tailored for engineering design, related to septic and stormwater management.

Feb 2024

Modifications to the plan due to a setback in the new temple location. New Addition of a Temp Temple building.

April 2024

Site plan distributed to engineers for report preparation

October 2024

Site plan submitted to city for approval.

2025

Poomi Puja

2025 - 2027

Core & Shell Construction Contract

2025 - 2030

Vimanam & Sannithanam work commence

2027 - 2029

Temple site work commences

2028 - 2030

Kumbabisegam